24 hour emergency electrician Typical response 1 hour across Maidstone 07366 354 116

Fixed prices in writing

Reactive Maintenance for Facilities in Maidstone

We provide reactive electrical maintenance for Maidstone facilities with risk-led attendance, safe isolation and compliant repairs. We prioritise exposed live parts, water-affected electrics, burning smells and essential supply failures, while keeping disruption proportionate. You’ll receive clear records of faults, risk controls, testing, remedial work, parts and certification where required. Our planned and out-of-hours support helps landlords, businesses and multi-site operators maintain an auditable compliance trail. Below, you’ll find key duties, costs and documentation details.

Three-phase distribution board in a commercial plant room
Commercial and industrial electrical work
  • NICEIC approved
  • Part P registered
  • £5m public liability
  • 12-month workmanship guarantee
  • Fixed price before we start
Reactive Maintenance for Facilities in Maidstone

Electrical compliance for Maidstone landlords and businesses

Electrical compliance inspections and reactive repairs from £95, covering safety checks, remedial work and documentation. Maidstone and surrounding areas including Loose, Park Wood, Fant, Allington and Barming. Guaranteed certified work with NICEIC/BS 7671 compliance and written reports for your property file.

What the law requires

In England, private landlords are required by regulation to obtain a valid Electrical Installation Condition Report (EICR) from a suitably qualified person at least every five years and, where applicable, before a new tenancy begins; you should diarise renewal dates and retain the report, any remedial records and relevant correspondence in an accessible compliance file.

You must provide the EICR to existing tenants within 28 days of it being completed, to new tenants before occupation, and to the local authority within seven days if formally requested; these records support tenant rights and help demonstrate timely action.

If an EICR records C1, C2 or FI observations the landlord is expected to arrange corrective work without undue delay and within any timescales specified on the report; once remedial work is complete written confirmation should be provided to the tenant and, if required, the council. Note that enforcement can result in financial penalties for breaches of the regulations; penalties vary and the maximum fine that may be imposed in some cases can be up to £40,000, but outcomes depend on the specific circumstances and enforcement decisions.

Social housing duties

Subject to confirmation against the primary legislation and any subsequent statutory instruments, the draft 2025 regulations appear to extend electrical safety duties to social housing: they are currently understood to apply to new tenancies from 1 November 2025 and to existing tenancies from 1 May 2026, with first inspections—if the final regulations require them—due by 1 November 2026.

Landlords should consider maintaining an auditable register of properties, inspection dates, remedial actions, certificates and tenant access attempts to demonstrate compliance with whatever duties are finally enacted. Unlike the private rented sector requirement under the existing Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 (which does not oblige landlords to check landlord‑supplied portable appliances every five years), some consultations and draft proposals have envisaged checks on landlord‑supplied electrical appliances; confirm whether this is included in the final social housing provisions before assuming a five‑year check cycle applies.

From 30 November 2026, draft arrangements under Awaab’s Law Phase 2 have been described as including electrical hazards and set tighter response expectations for immediate danger (for example, a 24‑hour response window has been suggested in guidance and proposals); check the final statutory wording and accompanying guidance for any binding timescales. We can assist with triaging reports, documenting risk decisions and arranging attendance, but we do not provide legal advice and any remedial action should be taken in accordance with the final legal requirements.

Effective tenant engagement is good practice to support access, reporting and clear safety advice, and community partnerships can help reach vulnerable residents. Keep records complete, dated and readily available for review to evidence compliance with the duties that are ultimately enacted.

Commercial fixed wire testing

Commercial fixed wiring testing, recorded in an Electrical Installation Condition Report (EICR), identifies deterioration, defects and electrical risks in workplace installations before they pose a hazard. Our inspections assess the installation, test relevant circuits and record observations, limitations, classifications and remedial priorities, providing an auditable record for your facilities management file.

There is no statutory interval for commercial EICRs. The commonly used guidance—five years for offices, three years for industrial premises and annual checks for higher-risk environments—derives from the IET Guidance Note 3. Testing scope and recommended intervals will be tailored to your premises, electrical load, environment, plant and occupancy, and informed by previous reports.

Duty holders must maintain electrical systems so they do not create danger under the Electricity at Work Regulations 1989. In addition, insurers, landlords and licensing bodies frequently require a current EICR. We schedule testing to minimise operational impact, offer out-of-hours and weekend appointments where required, record any access constraints, and deliver clear, prioritised documentation and recommendations for remedial action.

What it costs

Clear testing records help budget remedial work and planned maintenance; we provide fixed written prices so your bill won’t exceed the quote. Below are our standard charges and what they include.

Job Price What's included
Fault finding £80/hr Labour, testing, VAT
Emergency work £120/hr Out-of-hours labour; first hour minimum
Commercial EICR £30–£50/circuit Testing, report, certification

Prices do not include plaster or decoration making good, asbestos removal, DNO supply‑upgrade charges, or scaffold and access equipment.

Portfolio and multi-site work

For multi-site portfolios we deliver reactive electrical maintenance with site-specific records, defined escalation routes and documented remedial actions to meet compliance obligations and minimise operational disruption. Each location is maintained on an asset-led log recording reported faults, engineer attendance, risk controls, test results, parts fitted and certificates issued — providing a robust, defensible audit trail and enabling responsible persons to track outstanding items through to completion.

Our portfolio audits identify recurring defects, ageing wiring, consumer unit issues and compliance gaps across your estate. Prioritisation is driven by electrical risk, statutory duties and operational impact, ensuring resources are focused where they reduce liability and business disruption most effectively. Site benchmarking highlights patterns between premises so you can target planned works where they will deliver greatest value.

We agree reporting formats, approval limits and nominated contacts in advance so responsibilities remain clear and remedial work is authorised, traceable and properly closed. Work is scheduled to minimise disruption, including out-of-hours and phased delivery where required, to maintain business continuity and meet regulatory deadlines.

Out-of-hours and minimal-disruption working

When electrical faults arise outside normal operating hours, we’ll arrange attendance through our 24-hour emergency line and apply proportionate controls to make the installation safe. We’ll assess immediate risks, isolate affected circuits where necessary and confirm whether essential services can remain operational without exposing occupants, staff or contractors to danger.

For Night shifts, we’ll agree access arrangements, work boundaries, noise limits and safe isolation procedures before attendance. Our approach is designed to protect your operations while maintaining compliance with relevant electrical safety requirements. Silent drills can help test emergency call-out routes, keyholder availability and escalation arrangements without interrupting normal trading or building use. Where planned shutdowns are needed, we’ll coordinate timing around critical activities, maintain clear segregation of work areas and guarantee temporary measures are suitable for the environment.

Documentation you receive

After reactive maintenance, we’ll provide written records that identify the fault, the affected circuits or equipment, the safety measures taken and any remedial work completed. This gives you an auditable account for your maintenance log, helping facilities teams demonstrate control of electrical risk and plan any follow-up action.

  • Fault description and likely cause
  • Isolation, testing and safe reinstatement details
  • Circuits, equipment and locations affected
  • Parts fitted and remedial work completed
  • Certificate copies where testing or certification applies

We’ll record limitations, outstanding defects and recommendations clearly, so unresolved risks aren’t obscured by a temporary repair. Where work requires formal electrical certification, we’ll issue the relevant documentation promptly. Your records can then support internal compliance checks, contractor management, insurer enquiries and future maintenance decisions without relying on verbal handovers.

What it costs

JobWhat is includedPrice inc. VAT
EICR, up to 3-bedFull inspection, test results and report£150–£250
EICR, 4–5 bedFull inspection, test results and report£250–£350
PAT testingMinimum visit £80from £1.50/item
Consumer unit (fuse box) replacementBoard, RCBO/RCD protection, testing, certificate£500–£700
Out-of-hours emergencyFirst hour minimum, 24 hours a day£120/hr

All prices include VAT, parts, labour, testing and the certificate. Not included: making good plaster and decoration, asbestos removal, DNO charges for a supply upgrade, scaffold or access equipment. Fixed price in writing before we start — the bill is never larger than the quote.

Where we work

Areas we cover from Maidstone

See every area we cover

Frequently asked questions

How quickly can you come out if my home has an electrical emergency?

24 hours. We have a 24-hour emergency line and will follow your emergency procedures, arranging immediate or scheduled attendance to keep disruption low.

Will you tell me if I should turn off power until it's fixed?

Yes. We’ll advise if the installation should be isolated, restricted or monitored for tenant safety until repairs are completed.

Will I know exactly how much the repair will cost before you start?

Yes. We assess the fault, record findings and agree a fixed written price so the bill won’t exceed the quoted amount.

Do you provide proof that the repair was done correctly?

Yes. We document defects, corrective work and any certification needed to help you demonstrate compliance.

How do you handle access issues or parts that are hard to get?

Costs vary. Final price depends on access, fault complexity and parts; we’ll explain impacts upfront and keep you informed if delays affect scheduling.

Can you help if the same problem keeps happening?

Yes. We can align repeat issues with maintenance scheduling and asset tracking to identify equipment or circuits needing closer oversight.

Get a fixed price

Ring us or send a photo of the job. We give a fixed price in writing before any work starts, and the bill is never larger than the quote.

Call 07366 354 116 · 24hr